OPGW Live Line Stringing, Testing & Commissioning
- Check survey
- Calculation of OPGW section length and
detailed BOQ / Drum Schedule.
- Pre Installation test(Drum Test)
- Removal of existing Earth wire and OPGW
replace with Live/Offline Stringing
- Post Installation Test & Installation of
FODP.
- Splicing, Testing & Commissioning.
- Training for Installation, Spicing and
Testing & Commissioning of OPGW.
- AMC OPGW: Rectification / Routine
maintenance and breakdown maintenance of OPGW links.